Hydropower Projects

HYDROPOWER SOLUTION WITH A VERTICAL PELTON TURBINE

VAPTECH presents a hydropower solution based on one vertical Pelton solution with six injectors delivered for HPP Durucasu in Turkey. The project is operating under a net head of 125 m and a maximum discharge of 1 m3/s. The flow is utilized by a vertical Pelton turbine with 6 injectors by VAPTECH at a rated speed of 600 rpm. The total installed capacity for the power plant is 1109 kW

The scope of supply includes also butterfly valve DN600 PN16 designed and manufactured by VAPTECH, high pressure units, vertical three phase generator, PLC based automation system with SCADA. In addition VAPTECH provided supervision of installation works and commissioning of the plant. 